Case Studies

Shower Installation

Visualising

This shower enclosure was to replace an old enclosure which had the shower head and temperature controls in the middle of the shower, so the customer required a better set up. The original shower base was of poor quality and due to weight in the shower it had cracked so a solid resin base was used, along with a fully serviceable shower valve.

Results & Feedback

The shower was fitted for a commercial client as it was used by employees in a workplace. We had great feedback from our client, they reported to us that their employees loved it and were very complimentary on the workmanship.